Historically, LNG carriers have been unable to transit the Canal, mainly due to size restrictions. Following expansion of the Canal, this Guide will benefit LNG ship operators & Masters in preparation for transit of this vital waterway via the Cocoli & Agua Clara locks. When compiling this Guide, SIGTTO & the ACP referred to relevant ACP regulations as well as to SIGTTO guidance, industry standards & best practices. They took a proactive & consultative approach to identify issues that needed to be addressed to permit safe & efficient transit of LNG carriers through the Canal. The Guide looks at the geography of the new locks & discusses safety, minimum equipment levels & what might be considered to be good operating practices. Some LNG carriers may need modification to comply with the ACP requirements & the Annex to the Guide summarises the structural requirements. The Guide also
Includes:: a detailed fold-out chart of the entire Canal showing depths &
Dimensions, navigable waters, anchorages, aids to navigation, significant features, etc (this is intended as a ready-reference & is not to be used for navigation). It should be noted that this Guide is not a substitute for consulting the up-to-date applicable regulations & legislation (both national & international), which should always be followed in preference to this Guide.