More From Contributor

£124.94
TU119 Walbro In-Tank Injection Pumps Original Walbro In-Tank Fuel Injection Pump Module Fittings In (mm):- Fittings Out (mm):- Pump:- Voltage DC:- Flow Ltr/ Hr (Max):- Flow Ltr/ Hr @ 3 Bar (44psi):- Flow Ltr/ Hr @ 5 Bar (73psi):- Location To Tank (Mtrs) Thread

Size:
- Length (mm):- Diameter (mm):- Weight (Kg):- Applications:- Chrysler Please see ' Injection Pump Application list' in the download section Cross Reference Numbers:- CHRYSLER 4798485 CHRYSLER 4897417AA CHRYSLER 4897417AB

...
Available
£170.56
TU131 Walbro In-Tank Injection Pumps Original Walbro In-Tank Fuel Injection Pump Module Fittings In (mm):- Fittings Out (mm):- Pump:- Voltage DC:- Flow Ltr/ Hr (Max):- Flow Ltr/ Hr @ 3 Bar (44psi):- Flow Ltr/ Hr @ 5 Bar (73psi):- Location To Tank (Mtrs) Thread

Size:
- Length (mm):- Diameter (mm):- Weight (Kg):- Applications:- Jeep Please see ' Injection Pump Application list' in the download section Cross Reference Numbers:- JEEP 4856260 JEEP 4883261

...
Available
£121.84
OS50 Lumenition Optronic Ignition System ...
Available
£140.58
OS60 Lumenition Optronic Ignition System ...
Available
£100.66
OSA512 Lumenition Optronic Ignition Kits & Components for Specific Vehicles ...
Available
£154.7
OSA808ZD Lumenition Optronic Ignition Kits & Components for Specific Vehicles ...
Available
£305.77
OSA828ZD Lumenition Optronic Ignition Kits & Components for Specific Vehicles ...
Available
£64.14
OWV008 Misc Fuel Parts OWV008 ONE WAY VALVE 8MM TAILS ...
Available
£64.44
OWV010 Misc Fuel Parts OWV010 ONE WAY VALVE 10MM. ...
Available
£3
43N AC Spark Plugs Spark Plug AC 43N Only use this plug where the manufacturer recommends it, as the spark plug is not threaded all the way ...
Available

OSA808MM Lumenition Optronic Ignition Kits Long Lead 2CV OS And
Chopper Kit

OSA808MM Lumenition Optronic Ignition Kits & Components for Specific Vehicles
Availability: In Stock
£154.7

Product Description

OSA808MM Lumenition Optronic Ignition Kits & Components for Specific Vehicles

Reviews/Comments

Add New

Price History

Vouchers

No voucher codes found.
Do you know a voucher code for this product or supplier? Add it to Insights for others to use.

Facebook

Jargon Buster

Components - Multiple items used to complete the product.
Ignition - Starting a combustion of fuel process, or the process of setting something on fire.

Supplier Information

The Green Spark Plug Company
Find automotive parts and accessories at GSF Car Parts (https://www.gsparkplug.com/). Explore a wide selection of spark plugs, batteries, filters, and more for various car makes and models. With competitive prices and fast delivery, GSF Car Parts ensures you have what you need to keep your vehicle running smoothly. Trust the experts at GSF Car Parts for quality products and reliable service.
Page Updated: 2024-02-26 14:34:44

Community Generated Product Tags

Oh No! The productWIKI community hasn't generated any tags for this product yet!
Menu