The conduit is supplied in 3 metre lengths & can be cut down to size & prepared on site using the T900 conduit tool. The conduit run should always be the shortest possible route from the operator up to the first sash in the control line. It is important to use the T950 bending tool to ensure that the bends are not so tight so that they impede the travel of the chain inside the conduit. Highline Conduit 3m Length White